The merbau decking 140 x 19 price is typically about $6–$11 per lineal metre, or $45–$80 per m² for the boards alone (indicative — get itemised quotes). Installed with framing and labour, a merbau deck usually lands at roughly $350–$600 per m². Species, board length, grade and supplier drive the board price, and framing, height and access drive the rest. This guide compares merbau and spotted gum, shows how to work out lineal metres, and covers quotes and DIY limits. Our how to build a deck guide covers the method.
Key points
- Merbau 140 x 19 boards run roughly $6–$11 per lineal metre and spotted gum roughly $8–$14, before framing and labour (indicative — get itemised quotes).
- The biggest cost driver is the whole job, not the board: framing, height, stairs and access often outweigh the species price gap.
- The cheapest option is treated pine, but hardwoods such as merbau and spotted gum offer a more durable, premium finish.
- DIY works for a small ground-level deck; any building work valued at more than $5,000 must be done by someone licensed by Building Commission NSW.
Merbau decking 140 x 19 price: price table
Board prices vary by supplier and grade, so treat these rows as planning bands and check current price lists.
| Timber, 140 x 19 board | Per lineal metre | Boards per m² | Installed per m² |
|---|---|---|---|
| Merbau decking 140 x 19 price | $6–$11 (indicative) | $45–$80 (indicative) | $350–$600 (indicative) |
| Spotted gum decking 140mm price | $8–$14 (indicative) | $55–$100 (indicative) | $380–$650 (indicative) |
| Blackbutt | $8–$13 (indicative) | $55–$95 (indicative) | $380–$650 (indicative) |
| Ironbark | $9–$14 (indicative) | $60–$100 (indicative) | $400–$650 (indicative) |
| Treated pine decking | $3–$6 (indicative) | $25–$45 (indicative) | $250–$450 (indicative) |
| Composite decking, for comparison | Varies by brand | $60–$320 (indicative) | $280–$720 (indicative) |
- Boards per m² depends on the gap between boards, so ask the supplier for their coverage rate on the exact board.
- Installed prices include framing, fixings and labour on a typical suburban site, and exclude stairs, balustrades and lighting.
- Prices move with timber supply, so ask how long a written quote stays valid.
Merbau decking 140 x 19 price by city
Only Sydney and Melbourne handyman rates are verified, so use them to benchmark labour and collect local quotes elsewhere.
| City | Handyman hourly rate | Call-out or minimum | Timber decking guidance |
|---|---|---|---|
| Sydney | $57–$140 (typical $105) | $92–$170 (typical $140) | Use the table above; sloping lots and tight access raise framing and handling costs. |
| Melbourne | $52–$125 (typical $94) | $84–$160 (typical $125) | Labour rates run slightly lower, but hardwood board prices are set by national supply. |
| Brisbane | No verified rate held | No verified rate held | Get three itemised local quotes and ask about termite protection for framing. |
| Perth | No verified rate held | No verified rate held | Get three itemised local quotes and ask about delivery for long boards. |
| Adelaide | No verified rate held | No verified rate held | Get three itemised local quotes and ask about delivery for long boards. |
What affects the merbau decking 140 x 19 price
Six items move a quote up or down inside the table bands.
- Grade and board length: select-grade boards with fewer defects cost more, and longer lengths cut joins but can cost extra to deliver.
- Species and supply: merbau, spotted gum and blackbutt prices shift with supply, so a quote can change between months.
- Framing and footings: a sound existing frame saves money, while new bearers, joists and footings often cost more than the boards.
- Height and slope: a deck with the floor more than 1 m above ground falls outside the exempt development limits and needs more bracing.
- Finishing: merbau and spotted gum both need oiling or sealing, so allow for materials and labour from the start.
- Older homes: if the deck attaches to a pre-1990 wall or eave, identify suspect asbestos-containing material before anyone drills or cuts.
Spotted gum decking price per m2 vs merbau cost per m2
Price is only part of the choice, so compare the other differences before you order.
| Feature | Merbau | Spotted gum |
|---|---|---|
| Board price, 140 x 19 | Usually the lower of the two (indicative) | Usually higher than merbau (indicative) |
| Colour | Reddish brown that darkens with weather | Warm brown with natural colour variation |
| Tannin bleed | Can leach tannin onto nearby surfaces when new | Check the supplier’s advice for the batch |
| Source | Ask for evidence of responsible sourcing | Commonly Australian-grown; ask for certification |
| Finishing | Oil or seal as the supplier recommends | Oil or seal as the supplier recommends |
| Fixing | Pre-drill and use fixings the supplier approves | Pre-drill and use fixings the supplier approves |
How to work out lineal metres of decking
Lineal metres are the total length of board you need, so the supplier can price it per metre.
- Measure the deck length and width in metres and multiply them to get the area in square metres.
- Find the board cover width by adding the board width and your planned gap between boards.
- Convert the cover width to metres, then divide the deck area by that figure to get the lineal metres.
- Add the cut and waste allowance the supplier recommends, plus extra for stairs, picture-frame borders and trims.
- Check standard board lengths with your supplier, so you can plan joins over joists and keep offcuts small.
- Multiply the lineal metres by the quoted price per metre, then add framing, fixings and labour.
- Worked example (indicative — assumes a 5 mm gap and no waste allowance): a 5 m by 4 m deck is 20 m²; a 140 mm board plus 5 mm gap covers 0.145 m, so you need about 138 lineal metres.
- At merbau prices that board cost is roughly $830–$1,520, and at spotted gum prices roughly $1,100–$1,930 (indicative — get itemised quotes).
DIY vs hiring a pro for hardwood decking
Hardwood is hard on drill bits and fixings, so build skills and tools into your decision.
| DIY or a handyman | Book a licensed builder or trade |
|---|---|
| Laying boards on a sound, level frame with pre-drilled fixings | New deck or any building work valued at more than $5,000: licensed by Building Commission NSW |
| Measuring, ordering and cutting boards to length | Footings, bearers and fixing to the house, which are structural |
| Oiling and sealing new hardwood | A deck larger than 25 m² or higher than 1 m above ground |
| Checking planning limits on the NSW Planning Portal | Power for outdoor lights: book a licensed electrician |
| Replacing a few damaged boards later | Outdoor taps or showers: book a licensed plumber |
| Assembling outdoor furniture on the finished deck | Drilling into suspect pre-1990 sheeting or eaves |
How to save on merbau decking 140 x 19 price without cutting corners
- Compare at least three supplier prices for the same grade and length, because lower-grade boards cost more in waste and rework.
- Order the full quantity at once, with the allowance the supplier recommends, so colour and grade match across the deck.
- Keep the footprint simple and ground-level where you can, because stairs, height and curves add more cost than the boards.
- Consider treated pine for hidden or low-visibility areas, and keep hardwood for the main surface if the budget needs trimming.
- Bundle small tasks into one handyman visit: a Sydney half-day (4 hours) costs $230–$645 (typical $415), against a call-out of $92–$170.
- Pay no more than the 10% maximum deposit, and use a written contract: a small jobs contract under $20,000, a full contract over $20,000.
What a fair decking quote should include
- Itemised materials: species, grade, board size, lineal metres, joists, bearers, footings and fixings, with quantities.
- The finish: oil or sealer type, number of coats and who supplies it.
- Access, scaffold or hoisting needs, and a line for removing old decking and waste.
- Council or certifier fees if the deck is not exempt; confirm the limits with council or the NSW Planning Portal.
- The builder’s licence number, which you can check with Building Commission NSW, plus Home Building Compensation cover above $20,000.
- Workmanship warranty in writing, kept separate from the timber supplier’s terms, which you should read in full.
FAQ: hardwood decking prices
How to work out lineal metres of decking?
Multiply deck length by width to get m², then divide by the board cover width in metres, which is the board width plus the gap. Add the supplier’s waste allowance, plus extra for stairs and borders. Multiply the result by the per-metre price to estimate board cost.
What is the merbau decking cost per m2?
Boards alone are roughly $45–$80 per m² for 140 x 19 merbau, and installed with framing and labour roughly $350–$600 per m² (indicative — get itemised quotes). The deck’s height, access and extras can move the total well beyond that range.
What is the spotted gum decking price per m2?
Spotted gum 140 x 19 boards are roughly $55–$100 per m², and installed about $380–$650 per m² (indicative — get itemised quotes). Prices vary by grade, length and supplier, so request a written, itemised quote for your exact deck.
Is spotted gum decking 140mm price higher than merbau?
Usually yes, though prices move with supply and grade (indicative — get itemised quotes). Compare finish, source and supplier advice as well as price, because the cheaper board is not always the cheaper deck once framing and labour are added.
Do I need approval to build a hardwood deck?
Not if it meets the exempt development limits: up to 25 m², floor no higher than 1 m above ground, overall height up to 3 m and 900 mm from boundaries. Confirm with council or the NSW Planning Portal, and use a licensed builder when the job exceeds $5,000.
Getting hardwood decking priced in Sydney
If you want accurate numbers for your deck, we can measure up, replace damaged boards and handle the finishing coats. Book a Sydney handyman for decks and small jobs, and see our retaining wall cost, retaining wall building, fence and gate repair, paving and raised garden bed guides for the rest of the yard.